Water Utility Replaces Paper-Based Field Operations with Power Apps Mobile Platform
A UK water utility managing 2,400 field engineers replaced paper job sheets and legacy mobile data terminals with a Power Apps mobile platform, cutting job completion time by 38% and eliminating £160,000 in legacy system maintenance costs.
The Challenge
The utility's 2,400 field engineers were working from paper job sheets and 8-year-old ruggedised MDTs (mobile data terminals) that were costly to maintain and lacked connectivity in rural areas. Job dispatch was managed by a 24-person control room via phone and radio. Average time from fault report to engineer attendance was 4.8 hours, first-time fix rate was 61%, and asset condition data was inconsistently captured, creating maintenance planning blind spots.
Our Solution
We built a Power Apps mobile canvas app with full offline capability for areas without 4G coverage. Engineers receive job assignments, asset history, and site safety information on their devices. On-site they record fault diagnosis, parts used, work performed, asset condition readings, and photographic evidence, all syncing to Dataverse when connectivity is restored. Power Automate orchestrates dispatch, parts ordering, and escalation. Power BI gives the control room real-time engineer locations, job progress, and SLA status. Azure IoT Hub sensor data feeds predictive fault alerts directly into the job queue.
Key Outcomes
38% faster
Job Completion Time
Average time from dispatch to completion significantly reduced
61% → 84%
First-Time Fix Rate
Engineers arrive with better asset history and diagnostic information
£160,000 saved
Legacy System Cost
Annual MDT maintenance and software licensing eliminated
96% capture rate
Asset Data Quality
Up from 54% with paper forms, drives better maintenance planning
Technologies Used
Ready to Start?
Ready to Write Your Success Story?
Book a free consultation with our Microsoft-certified experts and discover how Power Platform can transform your business operations.